To seal around wall penetrations, use a two-piece metal plate bedded in urethane sealant. Sheathing wrap above the metal plate should lap over the plate while sheathing wrap below it should be slipped beneath.

Sainz Drywall,Inc
209-207-9086
29461 S Chrisman Rd
Tracy, CA
Clifford Construction
1-800-Clifford
4000 Rowena
Los Angeles, CA
ab construction co.
408-597-5490
1360 locust st.
San Jose, CA
MS Design&Build
415 3028734
65 edwards ave.
Sausalito, CA
H.A.S. Construction, Inc.
310-391-8434
11272 Washington Place
Culver City, CA
bishop construction
858-525-3736
6108 nancy dr
La Mesa, CA
LCCI
310-464-6220
6518 La Garita Dr
Rancho Palos Verdes, CA
Sloan Construction
925-229-5799
1330 Peach St
Martinez, CA
L&V Renovations
(530)306-8608
4618 VoloMine Dr.
Diamond Springs, CA
MCR INSTALLATIONS & SERVICE INC
71485430757
1107 N Westwood
Santa Ana, CA
Data Provided by:
 
Provided By:

Wall Flashing Details

Source: REPLACEMENT CONTRACTOR Magazine
Publication date: January 1, 2005

By REPLACEMENT CONTRACTOR Staff

Excerpted from JLC Field Guide to Residential Construction, published by JLC Books (JLConline.com), a division of Hanley Wood, LLC.

Gas and Water Lines/Conduit
To seal around wall penetrations, use a two-piece metal plate bedded in urethane sealant. Sheathing wrap above the metal plate should lap over the plate while sheathing wrap below it should be slipped beneath.

Cantilevered Joists/Beams

Cantilevered deck or balcony joists that project through the wall framing are trouble spots. Protect them with a two-part flashing sealed with urethane. The top flashing piece must overlap the bottom one.

Deck Ledger

Ledger flashing needs to be more than a Z-flashing running along the top edge of the ledger board. Use metal coil stock behind the ledger. Make sure the coil stock slips under the sheathing wrap above, and drapes over the sheathing wrap below the ledger.

Electrical Fixtures

Install electrical boxes and lighting fixtures on a hemmed metal flashing plate, as shown above. Do not tape the plate over the sheathing wrap; slit the sheathing wrap above the fixture and slip the plate beneath.

Click here to read full article from Replacement Contractor