Walls without Headers Stockton CA

The walls in Stockton were probably built using a concealed header at every sixth course in a bonding pattern known as a diagonal or herring-bone. These diagonal or herring-bone headers consist of brick units that were installed at an angle, as shown in Fig. 1. The corners of the units in the face brick stretcher course are clipped off to accommodate this diagonal unit.

Sutton's Landscape & Maintenance
(209) 824-1640
P.O. Box 664
Manteca, CA
Services
Residential Installation, Residential Maintenance, Residential Irrigation, Commercial Installation, Commercial Maintenance, Commercial Irrigation, Lawns, Lighting, Specialty Gardens, Water Effects, Patios, Concrete Work, Special Effects, Design, Drainage
Membership Organizations
California Landscape Contractors Association

Data Provided by:
Duck Creek Nursery
(209) 969-3514
Farmington, CA
 
Persson's Touch Landscape and Desig
(925) 240-1711
P.O. Box 1432
Discovery Bay, CA
Services
Residential Installation, Residential Irrigation, Lawns, Lighting, Specialty Gardens, Water Effects, Patios, Concrete Work, Special Effects, Design, Drainage
Membership Organizations
California Landscape Contractors Association

Data Provided by:
Valley Landscaping & Maintenance Incorporated
(209) 466-0605
saintockton, CA
 
Garcia Landscape
(209) 462-1585
11 S San Joaquin St
saintockton, CA
 
Norman's Nursery
(209) 887-2025
Linden, CA
 
Construction Maintenance And Design
(925) 513-3972
Discovery Bay, CA

Data Provided by:
Aspen Landscaping
(209) 462-2009
saintockton, CA
 
Ponds, Trellises, Landscaping, Waterfalls, Arbors
(209) 808-2446
saintockton, CA
 
Rubber Ground Cover Bark and Mulch
(209) 430-9777
saintockton, CA
 
Data Provided by:

Walls without Headers

Provided By:

Source: MASONRY CONSTRUCTION MAGAZINE
Publication date: September 1, 2005

I have seen several older masonry walls that have the appearance of running bond, yet do not contain any visible headers. In going over the walls with a metal detector, there is no indication of any wall ties.

Were these walls built without headers or ties?

The walls were probably built using a concealed header at every sixth course in a bonding pattern known as a diagonal or herring-bone. These diagonal or herring-bone headers consist of brick units that were installed at an angle, as shown in Fig. 1. The corners of the units in the face brick stretcher course are clipped off to accommodate this diagonal unit.

Another method for concealing headers involves splitting the face brick in half and then backing these split-face brick with a continuous row of header occurring every sixth course throughout the height of the wall, as shown in Fig. 2.

These methods are described in the book Masonry Carpentry Joinery - The Art of Architecture, Engineering and Construction in 1899 published by Chicago Review Press, which contains selections from the International Library of Technology published by the International Textbook Co., Scranton, Pa., in 1899.

In both methods the headers are held in by the mortar bond of the bed joint for the stretcher courses above and below the diagonal header or concealed perpendicular header. Because the headers are not visible on the exterior face of the wall.

Click here to read full article from Masonry Construction